Initial List of accepted abstracts

(listed in no particular order)

PW#Abstract Title
PW01Optimizing Auto reclosing in Line and Cable, Mixed Feeder
PW02Upgrading High-impedance Bus Differential Protection
PW03Initial Results of Testing Redundant Time Synchronization and Recovery Analysis of Protective Relays
PW04Series-Capacitor Line Protection—Fundamentals and New Challenges
PW05Adaptive Boundary-Seeking Test Generation for Protection Systems: A Vendor-Neutral Framework for Scalable Validation
PW06Lessons Learned from Implementing Automated Fault and Disturbance Analysis in Production Systems
PW07Characteristic vs Input – An Analysis of Impedances in Power Line Carrier Channels Applied Over High-Voltage Power Transmission Lines
PW08Wildfire Challenges and Mitigation on Distribution Feeders: Practices and Experience at Xcel Energy
PW09Network Engineering and Testing of IEC 61850-Based Distributed Busbar Protection Scheme
PW10Distributed Bus Protection Using Process Bus for a Large Transmission Substation at Duke Energy
PW11Rethinking Commissioning for a Digital Substation: From Field to Factory
PW12How to Eat the Elephant: How to Ease Into Your Digital Substation Adoption
PW13Practical Implementations of Breaker Failure Protection in Digital Substations
PW14Challenges for Modern PAC Systems in Inverter Dominated Networks and the Way Forward to Secure Tomorrow’s Power Supply
PW15Distribution Grid Fleet Management
PW16Automatic Transfer Switch over cellular Communication
PW17Intent-Based Networkingfor IEC 61850 EthernetNetworks
PW18Merits of Application-Focused Process Interface Units
PW19Precision Time Protocol (PTP)  Cyber Security Update
PW20A Survey of Fault Studies with a Large IoT Power Quality Sensor Network
PW21test
PW22Securing the Digital Substation: Encryption, IEC 61850 and the Journey to Quantum-Safe Utility Communications
PW23Centralized Protection in Distribution Substations: Testing Modular Relays with Conventional CT, VT Inputs and Process Bus Architecture
PW24From Analog CT, PT to Digital Process Bus – Hardware-in-the-Loop Protection Studies for Inverter-Dominated Transmission Systems
PW25Maximizing Redundancy in Digital Substations
PW26PTP-Synchronized Sampling Architecture for High-Precision Measurement in Merging Units
PW27Experience of Secure Interoperable Routable GOOSE Communication at the UCA international Users Group Interoperability Tests
PW28Advancements in Line Differential Protection: Model-based Line Differential Protection
PW29GGIO is GOOD Actually
PW30Twenty Years of Centralized Remedial Action at Southern California Edison: Architecture, Operational Lessons, and the Emerging Grid Control Platform
PW31IEC 61850 Top-Down Engineering
PW32A Proposal for IEC 61850-Based Modeling and Supervision of Battery Energy Storage Systems in Power Substations
PW33Cybersecurity at the IT/OT Interface in Protection, Automation, and Control Systems
PW34Modernization of PST Protection at Angra dos Reis: A Practical Approach Using Digital IEDs
PW35Multiple approaches to reduce SCL Engineering effort of an IEC61850 Digital Substation
PW36CT Saturation Impact on Busbar Differential Protection: Interactive Transient Closed-Loop Simulation for Protection Setting Optimization
PW37Centralized and Virtualized Protection Architectures for Digital Substations: Concepts, Testing, and Practical Considerations
PW38IEC 61850 – From Protection to Prediction: The Evolution of Substation Data Use
PW39Synchronous Condenser Protection
PW40IEC 61850: Some Assembly Required
PW41How to ensure that a Digital Substation is deployed and running with right configuration?
PW42Open-Source Approaches to IEC 61850 Engineering: A Case Study
PW43UCAIug Update
PW44Six-Phase Transmission – What? Why? & How?

* Paper titles may change by final submission – And final list of papers may be adjusted for changes in author schedules.